How the part fits? A 1-3/8” end bands are designed to go over 1-3/8” terminal posts.
Where is it installed? A 1-3/8” end band is installed to support the rail end at the top of the fence. The 1-3/8” end band will be placed adjacent to the rail end on the 1-3/8” terminal post.
How many do you need? You will need (1) 1-3/8” end band per termination of fence. For every full stretch of fabric, you will need (2) end bands for your (2) terminal posts.