How the part fits? A 2” end bands are designed to go over 2” terminal posts.
Where is it installed? A 2” end band is installed to support the rail end at the top of the fence. The 2” end band will be placed adjacent to the rail end on the 2” terminal post.
How many do you need? You will need (1) 2” end band per termination of fence. For every full stretch of fabric, you will need (2) end bands for your (2) terminal posts.